Course curriculum

  • 1

    Finding Installation Issues Before Mobilizing On-Site

    • Finding Installation Issues Before Mobilizing On-Site - Video Introduction

    • Introduction

    • Fastener And Anchor Locations That Don’t Allow Tolerance To Adapt To Field Conditions

    • Sealant Locations / System Anchors That Are Not Accessible Due To Building Components Being In The Way

    • System Framing That Is Too Close To Each Other

    • Site Issues And Obstructions That Can Affect Glass Installation

    • Stub Mullions In Storefront Framing That Don’t Allow Stops To Be Installed On-site

    • Improper Coordination Of Flashings / Membranes That Others Are Supposed To Provide

    • Course Quiz

  • 2

    Resource Library

    • Course Discussion Forum - Finding Installation Issues Before Mobilizing On-Site

Course Resource Library

This course contains additional resources and extras to give you the latest edge in the glazing industry.

  • Course Discussion Forum - Finding Installation Issues Before Mobilizing On-Site


Access the Library